Kitchens
Keukenoutlet
German cabinets, fronts and worktops, configured for the Caribbean climate.
You are here
A kitchen rarely lives alone. Tiles, splashback and sometimes a bathroom move with it. The Outlet family brings those disciplines together so one team plans, orders and installs the whole renovation.
Three sister stores, one owner, one approach. Together they cover every part of a kitchen or bathroom renovation on the island.
Kitchens
German cabinets, fronts and worktops, configured for the Caribbean climate.
You are here
Tiles
Floor, wall and splashback tiles with local stock on the island for fast delivery.
Visit TegeloutletBathroom
Sanitary, taps and bathroom finishing when the renovation includes the wet rooms.
Visit Sani-outletPlan structured around one rule: every discipline starts when the previous one finishes, so no team waits on another.
Step 1: Week 1
Before we start, we map out what is being renovated and in what order. A kitchen is rarely replaced in isolation. Tiles, splashback or even the bathroom often move in the same project.
Step 2: Week 1 to 2
Materials are not chosen from a screen. In one afternoon you walk through Keukenoutlet, Tegeloutlet and (optionally) Sani-outlet. Same approach, same people, three disciplines that become one project.
Step 3: Week 2 to 3
We draw your new kitchen in 3D. In the same session we look at which tiles go under it, how the splashback meets the cabinets, and (if included) how the bathroom matches in palette. One design vision across the whole renovation.
Step 4: Week 3
One approval moment, one order. No back-and-forth with three suppliers each running their own timeline. We coordinate between Germany, European tile suppliers and local stock.
Step 5: Week 4 to 11
While your kitchen is produced in Westphalia, we arrange the tile work and (if applicable) the demolition of the old bathroom. Six to eight weeks do not get lost in waiting.
Step 6: Week 11 to 12
Before the kitchen arrives, the room is ready. Tile floor is laid, plumbing is in the right place, electrical is set for induction and extraction. This part we coordinate with our fixed installation partner.
Step 7: Week 12 to 14
Installation takes four to five working days. We work in the right discipline order so no trade is waiting on another. Handover round at the end with checklist and warranty papers.
We coordinate the appointment with Tegeloutlet and Sani-outlet so you walk through all three showrooms in one visit. No obligations, no sales pressure.